Brief

To create an inspirational Learning Resource Centre, that was state of the art and with a "wow factor" impact. Key areas of focus were the student work areas and of course the LRC shelving.

Our solution

Working with the project manager and client, in a close consultancy basis, products were sourced and proposed that reflected the main objectives of the brief. Showroom visits were paramount to the client decision making process and completed a successful consultancy period to meet the client expectations and aspirations.

Implementation

IInstallation of the LRC was schedulled & managed at the end of a 4 week installation period, during which we were carrying out the full installation of FF&E to the entire college. Building strong relationships with the contractors, removal company and installation manager, enabled the smooth delivery of the LRC.

Download case study




Want to discuss this project?

Enter your details below and we'll call you back to discuss your requirements.




tel: 02392 324 611  |  contact us  |  29.7.2010
site map  |  terms & conditions
web design by something interesting